Jobwatch home
PT
Full-time

(MY) Manager, Factory Planning

Poet Technologies
Bayan Lepas, Penang, Malaysia 1 day ago

(MY) Manager, Factory Planning job in Bayan Lepas

The Manager, Factory Planning oversees production and supply planning for optical engine manufacturing, managing contract manufacturing partners and driving on-time delivery. Key responsibilities include leading the Sales and Operations Planning process, managing master production schedules, running material requirements planning, and developing the planning team. Requirements include a relevant degree and at least 10 years of experience in production or supply chain planning within semiconductor, photonics, or electronics manufacturing.

Position Overview

The incumbent will own the production and supply plan for POET's optical engine manufacturing in Penang, working with contract manufacturing partners to ensure on-time delivery to customers as volumes ramp up.

Job Responsibilities

  • Lead monthly Sales & Operations Planning (S&OP), turning forecasts, orders and NPI schedules into a production plan.
  • Own the master production schedule (MPS) and weekly build plans for contract manufacturers (CMs).
  • Maintain capacity models for partner lines and POET equipment; flag gaps early with recovery options.
  • Run material requirements planning (MRP) and resolve long-lead items and shortages with Procurement.
  • Control consigned materials and equipment at partner sites, including inventory accuracy.
  • Coordinate engineering builds, qualification lots and customer samples with volume production.
  • Chair weekly CM reviews; track WIP, output and delivery, and drive recovery plans when needed.
  • Own customer commit dates and on-time delivery with Engineering, Quality and Sales.
  • Support Finance on inventory valuation, excess & obsolete (E&O) reviews and cost forecasts.
  • Lead and develop a team of planners; define planning processes, KPIs and ERP/MRP standards.

Requirements

  • Degree in Engineering, Supply Chain Management or related field; APICS CPIM/CSCP is an advantage.
  • Minimum 10 years in production or supply chain planning, including 4 years leading a team.
  • Experience in semiconductor, photonics or electronics manufacturing, including CM planning and NPI ramps.
  • Strong in S&OP, MPS, MRP and ERP systems (e.g. SAP, Oracle).
  • Strong communication and stakeholder management skills.
  • Able to travel occasionally for business.

Unlock the full job description

Create a free account to read every duty and requirement, and to contact the employer directly.

(MY) Manager, Factory Planning key details

SectorLogistics & Supply Chain
ContractFull-time
Posted1 day ago

(MY) Manager, Factory Planning — frequently asked questions