CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF FOUR (4) FIXED-DO at iDE in Chibombo (Kalola) and Masaiti (Kafulafuta) Districts), Zambia, Central, Zambia focuses on Background and purpose iDE Zambia seeks a qualified biogas construction contractor to supply all required materials and construct,. The works comprise two digesters ( 6 m³ units) in each district: The contractor will train users in how to operate the bio-digesters and provide post-commissioning support.
CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF four (4)FIXED-DOME BIOGAS DIGESTERS
Client: International Development Enterprises
Location: Chibombo (Kalola) and Masaiti (Kafulafuta) Districts), Zambia
Works: Four (4) 6 m³fixed-dome biodigesters
Procurement: Open call for technical and financial proposals
Contract: Fixed-price, supply-and-install works contract with milestone payments
Currency: Zambian Kwacha (ZMW)
Indicative Duration: Approximately 48 working days from agreed commencement, subject to approved programme and site readiness.
1. Background and purpose
iDE Zambia seeks a qualified biogas construction contractor to supply all required materials and construct, install, test, commission and hand over four fixed-dome anaerobic digesters at approved beneficiary sites. The works comprise two digesters ( 6 m³ units) in each district: The contractor will train users in how to operate the bio-digesters and provide post-commissioning support.
The objective is to deliver durable, structurally stable, liquid-tight and gas-tight systems that safely produce and convey biogas and enable appropriate management of digestate (bio-slurry). Approved drawings, technical specifications and the priced Bill of Quantities (BOQ) shall form part of the contract.
2. Scope of works
2.1 Pre-construction engineering and mobilisation
- Conduct joint site inspections to confirm access, soil and groundwater conditions, available feedstock and water, safe separation from buildings and water sources, drainage, user needs and gas-pipeline routing.
- Confirm digester layout, chamber dimensions, invert levels, inlet/outlet elevations, excavation requirements, slurry arrangements and the construction sequence against approved drawings.
- Submit a site-specific method statement, programme, material procurement schedule, quality inspection and test plan, and occupational health and safety plan. Obtain iDE written site approval before permanent works.
- Submit for approval the bill of Quantities for each of the bio digester.
2.2 Contractor procurement and material management
The contractor shall procure, pay for, transport, unload, inspect, protect and securely store ALL materials, components, consumables and accessories required to complete the works in accordance with the approved BOQ and specifications. This includes masonry units, cement, sand, aggregates, reinforcement, waterproofing materials, formwork, gas pipes and fittings, valves, water traps, hoses, clamps, slurry structures and roofing materials where specified. The contractor shall also provide labour, supervision, plant, tools, testing equipment and personal protective equipment.
No material substitution or change to approved specifications is permitted without iDE’s prior written approval. The contractor shall verify quantities and include wastage, transport and handling in the fixed-price quotation; omissions or underestimation in the contractor’s pricing do not transfer procurement responsibility to iDE.
2.3 Civil, masonry and digester construction
- Set out and safely excavate to approved dimensions; protect excavations from collapse, surface runoff and unauthorised access; assess founding conditions before placing foundations.
- Construct the base, fermentation chamber, fixed dome/gas-holder, inlet and outlet/displacement chambers, inspection points and overflow arrangements in the approved geometry and levels.
- Use sound burnt-brick masonry or other approved units, correctly proportioned mortar, specified reinforcement and properly cured concrete/plaster. Ensure continuous bonded joints and stable dome geometry; do not backfill or conceal works before required inspection.
- Apply approved internal gas-tight and liquid-tight plaster/waterproofing systems, maintain curing and protect completed surfaces. Backfill in controlled layers without damaging the dome or pipework.
2.4 Biogas conveyance and slurry management
- Supply and install the approved gas outlet, isolation/control valves, suitable gas-rated pipeline, condensate/water trap, couplings, fittings, supports and appliance connection points as specified. Protect lines from mechanical damage, heat and inappropriate exposure.
- Install accessible water traps and isolation points; provide appropriate pipe falls, safe routing and secure joints. Confirm compatibility of all components with biogas service.
- Construct and finish the approved slurry outlet, collection/discharge and management structures, including supports and roofing where shown in the BOQ; ensure drainage, safe access and prevention of uncontrolled runoff.
2.5 Inspection, testing and commissioning
- Maintain hold-point inspections for setting out/foundations, chamber and dome masonry, reinforcement, plastering, pipework, backfilling and completed slurry structures.
- Perform and record liquid-tightness and gas-system leak/pressure tests using approved safe procedures and acceptance thresholds established in the technical specifications; rectify and retest nonconformities at contractor cost. Never use an open flame for leak detection.
- Charge/inoculate each digester using suitable feedstock, demonstrate safe start-up and operational checks, and verify gas delivery and functional operation when sufficient gas has developed. Record commissioning conditions and any follow-up verification needed where biological start-up exceeds the construction period.
- Hand over each system only after iDE verifies workmanship, safety, test results, training and documentation.
2.6 Training, warranty and follow-up
Provide practical user instruction at each site on feedstock preparation and loading, operating routines, gas use, condensate management, slurry handling, leak response, maintenance and fault reporting. Train designated iDE personnel through supervised demonstrations of setting out, masonry quality checks, gas installation, testing, commissioning and troubleshooting; record attendance and competencies. Provide a written workmanship/installation warranty stating duration, exclusions and response arrangements, plus at least three documented follow-up visits per digester during the agreed support period.
3. Allocation of units
District: 6 m³ 9 m³ Total
Chibombo: 2, 0, 2
Kafulafuta 2, 0, 2
Total 4, 0, 4
4. Roles and responsibilities
4.1 Contractor
The contractor has single-point responsibility for engineering verification, ALL material procurement and delivery, labour, tools and equipment, site supervision, safe construction, quality control, defect rectification, gas installation, testing, commissioning, training, records, warranty and after-sales visits. The contractor shall protect materials and completed works until acceptance and comply with applicable law and iDE safeguarding requirements.
4.2 iDE Zambia
iDE shall provide the approved design/BOQ and project coordination; identify and approve sites; facilitate beneficiary introductions and reasonable access; review submitted methods and reports; witness key inspections and commissioning; and certify satisfactory milestones for payment. iDE will NOT procure or supply construction materials under this assignment.
5. Deliverables and acceptance
Deliverables and Acceptance evidence:
1. Inception and procurement package: Approved programme, site assessments, method statements, safety plan, procurement schedule and confirmed setting out
2. Four constructed digesters: Four 4 m³ units conforming to approved drawings, BOQ and signed inspection records
3. Complete gas and slurry systems: Installed accessories, safe pipe routing, functioning slurry infrastructure and inspection records
4. Testing and commissioning: Per-site liquid-tightness, leak/pressure test and functional start-up records; defects closed
5. Training and handover: Beneficiary and iDE training registers, competency evidence, user guidance and signed site handover
6. Final technical report: As-built/site records, dated photographs, material compliance evidence, test results, defect register and completion summary
7. Warranty and follow-up: Written warranty and at least three recorded visits per digester with corrective-action reports
iDE shall issue written acceptance only after inspection confirms compliance with the approved specifications, safe operation and submission of required records. Acceptance does not waive contractual warranty obligations.
6. Implementation period and reporting
The indicative execution period is 48 working days, subject to an agreed start date and approved site-by-site schedule.. The bidders should rely on the two-district allocation above and the commencement date specified in the final contract.
The contractor shall submit concise weekly progress reports by site covering physical progress, procurement/delivery, inspections and test results, safety incidents, risks, variations requiring approval, training and next-week activities. Material changes to scope, price or programme require prior written authorisation.
7. Minimum contractor qualifications
- Demonstrable experience constructing fixed-dome biogas digesters of comparable scale, supported by photographs/completion records and at least two verifiable client references.
- Competent lead biogas technician/engineer or construction supervisor with demonstrated knowledge of masonry dome construction, waterproofing, biogas pipework, safe testing and commissioning.
- Adequate skilled masons, site supervision, equipment and financial/logistical capacity to procure all materials and execute works at both districts.
- Proven ability to train users, document tests and provide responsive after-sales support.
8. Health, safety, environmental and safeguarding requirements
The contractor shall implement a site-specific safety plan including PPE, excavation shoring/barricading, lifting and manual-handling controls, safe storage of cement and fuels, ventilation and ignition-source control during gas works, sanitation and waste management. Protect community members and children from worksites; child labour in hazardous construction is prohibited. Report incidents and safeguarding concerns promptly to iDE. Manage slurry and construction waste to avoid contamination of water, soil and public areas.
9. Financial proposal and payment
Submit a fully costed, fixed-price quotation in ZMW for the complete supply-and-install assignment, itemised by digester size and district and cross-referenced to the BOQ. The quotation MUST include all material procurement, delivery, handling, storage and wastage; skilled/unskilled labour; supervision; tools and equipment; excavation and construction; gas and slurry installations; testing and commissioning; training; travel and accommodation; warranty/follow-up; applicable taxes and other costs. State assumptions and any exclusions explicitly. Unpriced BOQ items shall be deemed included elsewhere in the tender price unless clarified in writing before award.
Milestones and Payment trigger
Mobilisation: Signed contract, approved inception package and verified mobilisation/procurement readiness
Construction progress: iDE-certified completion of agreed physical construction and installation stages
Practical completion: Successful inspection, required tests, training, signed handover and accepted final report
The final contract shall specify payment percentages, any retention and the warranty/defects-liability arrangements. Payments are conditional on certified milestones; advance payment, if any, is subject to iDE procurement rules and agreed safeguards.
10. Submission requirements and evaluation
Bidders shall submit: signed cover letter; company profile and registration/tax documents (where applicable); relevant qualifications and key personnel CVs; comparable assignment evidence and two references; technical methodology and schedule; site safety and quality plans; proposed warranty/after-sales arrangements; and a detailed priced BOQ and consolidated financial quotation.
Evaluation criterion and Weight
Understanding and technical approach - 20%
Relevant fixed-dome construction experience - 25%
Personnel competence - 15%
Methodology, schedule and procurement capacity - 15%
Quality assurance, commissioning and safety - 10%
Warranty and after-sales - 5%
Financial offer/value for money - 10%
TOTAL - 100%
Only technically responsive submissions will proceed to financial consideration. iDE may seek clarifications, verify references and reject non-responsive proposals in accordance with its procurement procedures.
11. Confidentiality and ownership
The contractor shall keep beneficiary, project and technical information confidential and shall not publish photographs or information without iDE’s prior written approval. Assignment-specific technical reports, records, checklists and training materials shall belong to iDE Zambia unless otherwise agreed in writing.
12. Publication and submission information
Procurement reference: ZM-TLTN-0005
Publication date: 17th November, 2026
Closing date and time: 27th November, 2026, 17:00hrs CAT
Submission address: All Application should be submitted via the Workable portal
Clarification contact and deadline: For any clarifications regarding the advertisement, please email: cndopu@ideglobal.org
Expected contract commencement: 18th January, 2027
The solicitation should be issued with the approved drawings, technical specifications and BOQ as annexes. These documents define final dimensions, materials, testing thresholds and construction details.
Unlock the full job description