Annaul Maintenance Contract of VRF System (1st Jan 2026 - 31st Dec 2028)

Annaul Maintenance Contract of VRF System (1st Jan 2026 - 31st Dec 2028)

  •   1 Vacancy
  • 10 Views

Offer Salary

Sign in to view salary

For Freelance

No

Job Description

Annual Maintenance Contract of VRF System (1st Jan 2026 - 31st Dec 2028) Contract Posted On: October 21, 2025 Closing On: October 26, 2025 Job Reference JB004-25-03521 Scope of Work - Annual Maintenan...

Annual Maintenance Contract of VRF System (1st Jan 2026 - 31st Dec 2028)

Contract Posted On: October 21, 2025 Closing On: October 26, 2025

Job Reference

JB004-25-03521

Scope of Work - Annual Maintenance Contract for VRF System

Location: Jumeirah Village Circle (JVC), Dubai, UAE

System: Variable Refrigerant Flow (VRF) Air Conditioning System

Contract Duration: 36 Months

Objective

To ensure efficient, reliable, and uninterrupted performance of the VRF system throughout the year by performing comprehensive preventive maintenance, inspection, and servicing as per OEM recommendations and best industry practices.

System Overview

The VRF system serves the common areas and apartments of Villa Myra Building and consists of:

  • Indoor cassette, ducted, and wall mounted units
  • Control system (central and local controllers)
  • Drain piping and insulation network
  • Associated electrical components and panels
Service Schedule

Major Service: Once per year - Typically, before summer season

Minor Service: Three times per year - Every quarter after major service

Scope of Work (not limited to below)

To be carried out once annually and includes:

  • System Shutdown and Inspection
  • Isolate power supply and perform safe shutdown.
  • Visual inspection of outdoor and indoor units for damages, corrosion, or leaks.
  • Check refrigerant circuit for oil traces and potential leaks.>
  • Cleaning Activities
  • Thorough chemical cleaning of indoor coil fins using non corrosive coil cleaner.
  • Cleaning of outdoor condenser coils using high pressure water and approved chemicals.
  • Cleaning and disinfecting all indoor unit drain pans and strainers.
  • Flushing and clearing of condensate drain lines.
  • Cleaning of fan blower wheels and filters.
  • Mechanical and Electrical Checks
  • Tightening of all electrical terminals, contactors, and relays.
  • Inspection and testing of compressor amperage, voltage, and insulation resistance.
  • Check and recalibrate thermistors and sensors.
  • Check condition and operation of fan motors, bearings, and blades.
  • Verify operation of expansion valves and refrigerant circuit.
  • Refrigerant and Cooling Performance
  • Check refrigerant pressure, temperature, and superheat/subcool values.
  • Verify refrigerant level; top up if necessary (subject to approval and separate billing if leakage found).
  • Performance test of the entire system to ensure cooling efficiency.
  • Control System and BMS Check
  • Inspect and test control panels, timers, and remote controllers.
  • Confirm system integration with Building Management System (BMS) if applicable.
  • Final Testing and Reporting
  • Record operating parameters (pressure, current, voltage, temperature).
  • Submit detailed service report with findings, recommendations, and photos.
B. Minor Service (Quarterly Preventive Maintenance)

To be carried out three times per year and includes:

  • Cleaning of indoor unit filters and front panels.
  • Cleaning of drain pans and clearing of drain lines.
  • Inspection of refrigerant piping and insulation.
  • Check operation of indoor and outdoor fans.
  • Electrical connection inspection and tightening.
  • Measure and record operating pressures and temperatures.
  • Ensure control systems, sensors, and thermostats are functioning correctly.
  • Visual inspection of outdoor units for debris and obstructions.
  • Light coil cleaning (if required).
  • Submit service report with observations and recommendations.
  • Contractor shall provide emergency breakdown support during working hours at no additional charge.
  • Emergency response time shall not exceed 4 hours for critical issues.
Documentation and Reporting

The contractor shall provide:

  • Preventive maintenance checklist for each service.
  • Annual performance summary report after the major service.
  • Log of any corrective or breakdown works performed.
Health, Safety, and Environment (HSE)
  • All maintenance works must comply with Dubai Municipality, RERA, and Trakhees safety standards.
  • Use of personal protective equipment (PPE) is mandatory.
  • Disposal of condensate waste and chemicals must follow environmental regulations.
Contractor Responsibilities
  • Deploy trained HVAC technicians with VRF experience.
  • Maintain minimum stock of consumables and filters.
  • Ensure all tools and test equipment are calibrated and approved.
  • Coordinate with building management prior to every service visit.
Building Management Responsibilities
  • Provide access to all plant rooms, apartments (where applicable), and service areas.
  • Ensure power and water availability during maintenance.
  • Review and approve service reports and recommendations.
  • Four service visits per year (1 Major + 3 Minor).
  • Emergency breakdown support.
  • Annual performance report with recommendations for system improvement.
Villa Myra

Residential

Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates

Tracking.aspx?iPKt3YrN7hVOWv%2b7xHXWV%2bARTEbfqs5Gy
  • Share this job:
Related Jobs

Dubai, AE

Sign in to view salary

Published: 20 hours ago

Dubai, AE

Sign in to view salary

Published: 4 days ago

Dubai, AE

Sign in to view salary

Published: 5 days ago

Dubai, AE

Sign in to view salary

Published: 5 days ago